Skip to main content

Tax Rebate Incentive Program

Refer to Commission Rule 165:10-21 PART 17 for Qualification Criteria and Application Procedures.

INSTRUCTIONS for preparing FORM 1535

Check Box and Fill Out RESERVOIR DEWATERING PROJECT section and other sections that are applicable

Minimum required attachments:

  • A) Initial production test or data indicating 5:1 water/oil or water/gas ratio
  • B) Structure and isopach maps of applicable reservoir
  • C) Schematic diagram of electrical grid and dewatering and water disposal equipment

Refer to Commission Rule 165:10-21 PART 19 for Qualification Criteria and Application Procedures.

Instructions for preparing Form 1535

Check Box and Fill Out ENHANCED RECOVERY PROJECT section and other sections that are applicable

Minimum required attachments:

  • A production test or data showing oil production indicates total content of oil recovery after the use of enhanced recovery methods did not exceed 1% by volume
  • Structure and isopach maps of applicable reservoir
  • Map and schematic diagram of producing, injection and disposal wells and other water injection or circulating equipment.
Last Modified on Jan 05, 2021
Back to Top