Skip to main content

Policy & Procedure

(Section 1100 - Materials Management)

Item NumberDescription of ItemRev. Date
1101.0Material Information8/9/2006
1101.1Material Detail3/18/2010
1101.2Sampling and Testing Requirements5/17/2007
1103.0Contract Materials7/10/2006
1103.1Contract Materials6/28/2007
1103.2Contract Sampling and Testing9/23/2008
1105.0Approved Lists7/11/2006
1105.1Approved Materials12/13/2006
1105.2Sampler Qualifications4/15/2010
1105.3Welders7/13/2006
1105.4Calibrated Equipment (Will Not Be Used)4/18/2007
1105.5Test & Fee Schedule2/28/2007
1105.6Producer/Supplier5/2/2011
1105.7Producer/Supplier Materials7/14/2006
1105.8Qualified Labs9/12/2011
1105.9Tester Qualifications4/15/2010
1106.0Approved Lists Reports7/22/2006
1106.3Calibrated Equipment Report (Will Not Be Used)7/22/2006
1106.10Test & Fee Schedule Report8/23/2004
1106.13View Saved Reports9/11/2006
1107.0Mix Design9/11/2006
1107.1Contract Mixes9/11/2006
1107.3Aggregate Blend9/11/2006
1107.6SuperPave Mix Design1/31/2012
1107.7Pavement Structural Design Data (Will Not Be Used)9/11/2006
1107.8Portland Cement Concrete Mix Design6/15/2006
1107.9Aggregate (Soil) Mix Design6/17/2005
1108.0Mix Design Reports9/11/2006
1108.1Aggregate (Soil) Mix Design List9/11/2006
1108.2Contracts For Mix Design9/11/2006
1108.5Mix Design For Contract3/12/2007
1108.6PCC Mix Design List1/14/2005
1108.7Sample Using Mix Design Report3/12/2007
1108.8SuperPave Mix Design List3/12/2007
1108.9View Saved Reports (Duplicate of 1106.13)7/10/2007
1109.0Sampling and Testing3/8/2005
1109.1Sample Information9/16/2010
1109.2Find Sample3/12/2007
1109.3Sampling and Testing Requirements (Duplicate of 1101.2)10/6/2004
1109.4Standard Sample Remarks3/12/2007
1110.0Sampling and Testing Reports3/8/2005
1110.2Sample Backlog Summary Report3/12/2007
1110.3Lab Statistics Report3/12/2007
1110.4Testing Charges Report3/9/2005
1110.5View Saved Reports (Duplicate of 1106.13)7/10/2006
1111.0Process List3/13/2007

 

(BACK TO TOP)

Last Modified on Feb 07, 2023
Back to Top